Before design money

Feasibility & site assessment

A rebuild decision rests on the land, not the house. Feasibility work reads the block the way an assessing certifier eventually will: zoning, overlays, easements, slope, soil and street context all shape what can be approved and what it will take to build.

Scope

What this covers

  • Review of zoning, planning overlays and any heritage, flood or bushfire mapping that touches the lot

  • Geotechnical investigation and site classification of the soil, which later drives footing design

  • Identification of easements, sewer mains, stormwater lines and protected trees that constrain the building envelope

  • Survey review covering boundaries, contours and driveway gradients

  • A plain-language read on whether the block suits a complying development pathway or points toward a council DA

Timing

When it's needed

Feasibility belongs before contracts, before design fees and ideally before purchase if you are buying to rebuild. Discovering a sewer main under the proposed footprint after drawings exist is an expensive way to learn the block's constraints.

Never enter a demolition site or a partially demolished structure, and never disturb materials you suspect contain asbestos, assessment and removal belong to appropriately licensed contractors. Keep children and pets clear of site fencing, and report damaged hoarding or exposed hazards to the site contact immediately.

Quote variables

What shapes the scope

Residential building work in NSW above the licensing threshold must be carried out by the holder of a current contractor licence issued by NSW Fair Trading, and contracts above the insurance threshold require home building compensation cover to be in place before deposits are taken. Check any licence number against the public register and ask to see the insurance certificate before signing.

Rebuild stages

Start your quote

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.